Project Cases

The three projects below are ones Mingjue participated in and completed on-site delivery for. We describe only what can be made public: the site conditions, the work Mingjue undertook and the delivery approach — no unauthorised customer data or performance metrics.

The value of an industrial robotics project rarely shows in a demo video. It shows when the site is real, the weather is bad and the ground is uneven — and the system still has to complete the agreed work. The three projects below come from power, tunnel and overseas sites, and represent three different levels of delivery difficulty.

Case 1 · High-temperature inspection and tuning at a 500kV substation in Chengdu

Site conditions
Equipment area of a 500kV substation: narrow passages and densely packed equipment. Tuning took place in the hot season, and continuous outdoor work placed high demands on heat dissipation and battery management.
Work Mingjue undertook
Deployed an add-on mission system on a proven industrial quadruped platform, completed on-site route mapping and point calibration, configured inspection tasks, and tuned navigation and task execution under high-temperature conditions.
Delivery approach
Item-by-item acceptance against the agreed routes, points and task flows; records and operating instructions delivered; on-site personnel took part in training.
What matters in this kind of project
Not getting it to run once, but reproducing it stably on the same route over consecutive days. Endurance and heat management in high temperatures have to be worked out before implementation.

Case 2 · Power tunnel inspection for SP Group in Singapore

Site conditions
A power tunnel is an underground confined space: no satellite positioning, limited lighting, and both passage space and communications coverage constrained by the structure.
Work Mingjue undertook
Configured navigation and inspection tasks by tunnel section, completed add-on system integration and on-site tuning, so that the equipment could execute tasks as planned within the agreed sections and return records.
Delivery approach
Section-by-section tuning and acceptance; delivery of a section list, operating instructions and agreed exception-handling arrangements.
What matters in this kind of project
Positioning inside the tunnel and handling of disconnections are the core issues; the update and verification mechanism after the map is built determines long-term usability.

Case 3 · Site related to NEOM in Saudi Arabia

Site conditions
An overseas large-scale construction site: open-air environment with wide variation in light and ground conditions, and work organisation and communication spanning time zones and languages.
Work Mingjue undertook
Participated in on-site deployment and tuning, completed installation, configuration and task verification of the add-on system as required by the project, and confirmed the acceptance criteria together with the on-site team.
Delivery approach
On-site support and acceptance cooperation at project milestones; operating and maintenance instructions delivered.
What matters in this kind of project
On overseas sites, delivery rhythm, spare parts and staffing often affect progress more than the technology itself; boundaries need to be clear at the contract stage.

A note on case data

Why are there no efficiency-gain percentages or deployment counts in these cases?

Customer project data belongs to the customer and is not disclosed without authorisation. We would rather describe the site conditions, the work undertaken and the acceptance approach, because those are what show whether a solution can be reused.

Can you provide more detailed project material?

After a non-disclosure agreement is signed, we can provide more specific delivery records and technical descriptions within the project scope. Please contact us stating the purpose and scope.

Which robot dog was used in these projects?

Mingjue's position is to deploy self-developed add-on mission systems on proven industrial quadruped platforms. The specific platform model is selected according to project requirements and is not tied to a single brand.

Is your site different from these three? Tell us the site conditions, task list and acceptance criteria, and we will judge whether it can be done and how it should be done.

Contact us →