The problems in a tunnel are concrete: no satellite signal, insufficient lighting, heavy dust and standing water on the ground. For a robot dog to work here, it needs section-by-section on-site calibration and tuning, not generic navigation.
Passage and sensing conditions in tunnels and underground spaces are more demanding than above ground. The focus of Mingjue's delivery at these sites is to tune localization, traversal and task execution to a repeatable standard in real sections, not to demonstrate once in a laboratory.
What makes these sites hard
- No satellite positioning
- GNSS is unavailable in tunnels, so localization relies on lidar or vision; maps must be built per section and checked periodically.
- Lighting and dust
- Lighting is uneven during construction and dust degrades image quality, so the sensing approach must be chosen for actual working conditions with cleaning and maintenance allowed for.
- Ground conditions
- Standing water, mud and temporary pipework change how hard the ground is to cross, so routes and gait strategies must be configured section by section.
- Limited communications
- Wireless coverage in tunnels is unstable, so autonomous return and data backfill after a mission interruption need a fallback plan.
What Mingjue delivers on these sites
- Section mapping and localization
- A reusable map is built per tunnel section, localization and relocalization strategies are configured, and a map update method is provided.
- Sensing and payloads
- Visible-light, thermal or gas detection units are integrated to the inspection goal, with mounting positions chosen for dust and lighting conditions.
- Missions and fallbacks
- Section missions, return-to-home strategies and disconnection handling are configured so equipment behaviour is predictable when communications fail.
- On-site tuning and acceptance
- Tuning and acceptance are carried out section by section in real conditions, with a section list and operating instructions delivered.
What we review with the customer at acceptance
- Section stability
- Is task execution stable within the agreed sections, and is repeated localization deviation within the permitted range?
- Data completeness
- Does data collected under dust and low light meet project requirements, and can gaps be identified?
- Disconnection handling
- On communications loss, does the unit return or stop safely as agreed, and can data be backfilled once the link is restored?
- Maintainability
- Can sensor cleaning, battery replacement and map updates be done by site personnel?
Frequently asked questions
Can it work in a tunnel without GPS?
Yes, but it relies on lidar or vision localization, with mapping and relocalization tuning done on site. The longer the tunnel and the more repetitive the structure, the more mapping and verification work is required.
Will construction dust affect operation?
It will. The sensing approach involves trade-offs, and cleaning and maintenance intervals must be scheduled for site conditions; this has to be counted in operating costs before implementation.
Can it replace manual inspection of initial tunnel support?
It depends on the inspection items and accuracy requirements. Visual and visible-light recording tasks are a good fit; items that rely on specialist instruments and acceptance criteria need the boundary agreed with the inspection body.
Can it connect to our existing tunnel monitoring system?
Data interfaces can be connected as agreed for the project. Network conditions inside the tunnel and the way data is stored on site must be confirmed in advance.
Other scenarios
- Power Inspection
- Equipment inspection for substations and power facilities.
- Plant Mobile Operations
- Mobile inspection and assisted operations on plant roads and around workshops.
- Outdoor Inspection
- Outdoor routes with wide swings in light and ground conditions.
- Robot Dog Selection Guide
- How to decide on a configuration by task, environment and budget.